Haït, Alain and Artigues, Christian An hybrid CP/MILP method for scheduling with energy costs. (2011) European Journal of Industrial Engineering, 5 (4). 471-489. ISSN 1751-5254
|
(Document in English)
PDF (Author's version) - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader 278kB |
Official URL: http://dx.doi.org/10.1504/EJIE.2011.042742
Abstract
This paper deals with energy-related job scheduling for a foundry, in order to minimize the electricity bill. Accounting for energy and human resource constraints leads to better solutions in terms of cost and overall energy consumption. We propose a hybrid heuristic based on a two-step constraint/mathematical programming approach that improves significantly the computation time, compared to the full MILP model.
Item Type: | Article |
---|---|
Audience (journal): | International peer-reviewed journal |
Uncontrolled Keywords: | |
Institution: | French research institutions > Centre National de la Recherche Scientifique - CNRS (FRANCE) Université de Toulouse > Institut National Polytechnique de Toulouse - Toulouse INP (FRANCE) Université de Toulouse > Institut National des Sciences Appliquées de Toulouse - INSA (FRANCE) Université de Toulouse > Institut Supérieur de l'Aéronautique et de l'Espace - ISAE-SUPAERO (FRANCE) Université de Toulouse > Université Toulouse III - Paul Sabatier - UT3 (FRANCE) |
Laboratory name: | |
Statistics: | download |
Deposited On: | 06 Mar 2012 13:31 |
Repository Staff Only: item control page