Haït, Alain and Artigues, Christian Scheduling parallel production lines with energy costs. (2009) In: 13th IFAC Symposium on Information Control Problems in Manufacturing (INCOM09), 03-05 June 2009, Moscow, Russia .
![]() |
(Document in English)
PDF (Author's version) - Depositor and staff only - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader 184kB |
Abstract
This paper deals with integration of energy-related constraints into scheduling for a foundry. Accounting for energy and human resource constraints leads to better solutions in terms of cost and overall energy consumption. Following some previous work (Hait et al. (2007)), we propose a hybrid heuristic based on a two-step constraint/mathematical programming approach to solve the problem.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Audience (conference): | International conference proceedings |
Uncontrolled Keywords: | |
Institution: | Université de Toulouse > Institut Supérieur de l'Aéronautique et de l'Espace - ISAE-SUPAERO (FRANCE) French research institutions > Centre National de la Recherche Scientifique - CNRS (FRANCE) |
Laboratory name: | Département de Mathématiques, Informatique, Automatique - DMIA (Toulouse, France) - Automatique, Dynamique et Interface des Systèmes - ADIS Laboratoire d'Analyse et d'Architecture des Systèmes - LAAS (Toulouse, France) - MOGISA |
Statistics: | download |
Deposited On: | 14 Apr 2009 15:45 |
Repository Staff Only: item control page