Qaeze, Fenemedre Drazine and Guillaume, Romain
and Thierry, Caroline
Robust optimization for mine planning.
(2016)
In: 11ème Conférence Francophone de Modélisation, Optimisation et Simulation des Systèmes (MOSIM 2016), 22 August 2016 - 24 August 2016 (Montréal, Canada).
|
(Document in English)
PDF (Author's version) - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader 474kB |
Abstract
In this paper, we are interested in mine planning under uncertainty on the capacity of extraction in a mine complex. Indeed, in real life there is always a gap between planned activities and activities carried out during the period. In this paper, we focus on the activity of extraction. In order to achieve this challenge, we proposed a model to represent the mining complex. This model takes into account the uncertainty on the capacity by the use of scenarios. In order to face the uncertainty on the capacity of extraction we propose a robust approach with the MaxMin decision criterion. To the best of our knowledge, while the bulk of the literature treats the optimization in mining complex with stochastic approaches, this paper uses a robust approach under uncertainty. A case study using data from a nickel laterite company is used in order to implement the proposed model under uncertainty on capacity.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
HAL Id: | hal-01809274 |
Audience (conference): | International conference proceedings |
Uncontrolled Keywords: | |
Institution: | Université de Toulouse > Institut National Polytechnique de Toulouse - Toulouse INP (FRANCE) French research institutions > Centre National de la Recherche Scientifique - CNRS (FRANCE) Université de Toulouse > Université Toulouse III - Paul Sabatier - UT3 (FRANCE) Université de Toulouse > Université Toulouse - Jean Jaurès - UT2J (FRANCE) Université de Toulouse > Université Toulouse 1 Capitole - UT1 (FRANCE) |
Laboratory name: | |
Statistics: | download |
Deposited On: | 02 May 2018 09:15 |
Repository Staff Only: item control page