Proactive tactical planning approach for large scale engineering and construction projects

Cherkaoui, Kaouthar and Baptiste, Pierre and Pellerin, Robert and Haït, Alain and Perrier, Nathalie Proactive tactical planning approach for large scale engineering and construction projects. (2017) Journal of Modern Project Management, 5 (1). 96-105. ISSN 2317-3963

[img]
Preview
(Document in English)

PDF (Author's version) - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
2MB

Official URL: https://doi.org/10.19255/JMPM01309

Abstract

Large-scale engineering and construction projects are subject to a great level of uncertainty which lead planners to use time buffers and add contingencies to the estimated budget. However, the size of the buffers and the contingency amounts are usually arbitrarily established and projects still encounter severe time and cost overruns. In this paper, a robust planning approach for tactical planning of large-scale engineering and construction projects is proposed. The approach relies on a simple resource buffering strategy applied to the aggregate periods. An extensive simulation-based experiment was conducted to test the robustness and performance of the proposed approach. Results show that the proposed buffering strategy can considerably reduce project cost variations and can provide comparable performance results with those obtained using a disaggregated approach, especially on instances characterized by a large number of resource groups.

Item Type:Article
Audience (journal):International peer-reviewed journal
Uncontrolled Keywords:
Institution:Other partners > Ecole Polytechnique de Montréal (CANADA)
Université de Toulouse > Institut Supérieur de l'Aéronautique et de l'Espace - ISAE-SUPAERO (FRANCE)
Laboratory name:
Statistics:download
Deposited On:22 Jun 2018 12:09

Repository Staff Only: item control page