Masmoudi, Malek and Hans, Erwin W. and Haït, Alain Tactical project planning under uncertainty: fuzzy approach. (2016) European Journal of Industrial Engineering, 10 (3). 301-317. ISSN 1751-5254
|
(Document in English)
PDF (Author's version) - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader 600kB |
Official URL: http://dx.doi.org/10.1504/EJIE.2016.076381
Abstract
At the tactical planning level in a multi-project environment, uncertainties are inherent to the workloads, and costs may be involved for using non-regular capacity and violating project due dates. We propose an approach to identify whether non-regular capacities might be needed to meet the projects' due dates. This problem is known as rough-cut capacity planning (RCCP) problem under uncertainty. We propose a possibilistic approach, which is based on modelling uncertain workloads with fuzzy sets. We present the resulting fuzzy rough-cut capacity planning (FRCCP), and show that we can use the possibilistic approach to provide a robust solution with a fuzzy resource loading profile that supports managers in decision making. We provide a simulated annealing approach to solve the FRCCP, and test it against several existing RCCP approaches. For the experiments we use real life instances from a shipyard maintenance centre.
Item Type: | Article |
---|---|
Audience (journal): | International peer-reviewed journal |
Uncontrolled Keywords: | |
Institution: | Université de Toulouse > Institut Supérieur de l'Aéronautique et de l'Espace - ISAE-SUPAERO (FRANCE) Other partners > University of Twente (NETHERLANDS) |
Laboratory name: | |
Statistics: | download |
Deposited On: | 27 Jan 2017 15:23 |
Repository Staff Only: item control page