Haït, Alain and Artigues, Christian An hybrid CP/MILP method for scheduling with energy costs. (2011) European Journal of Industrial Engineering, 5 (4). pp. 471-489. ISSN 1751-5254
| (Document in English) PDF (Author's version) - Depositor and staff only - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader 271Kb |
Official URL: http://dx.doi.org/10.1504/EJIE.2011.042742
Abstract
This paper deals with energy-related job scheduling for a foundry, in order to minimize the electricity bill. Accounting for energy and human resource constraints leads to better solutions in terms of cost and overall energy consumption. We propose a hybrid heuristic based on a two-step constraint/mathematical programming approach that improves significantly the computation time, compared to the full MILP model.
| Item Type: | Article |
|---|---|
| Audience (journal): | International peer-reviewed journal |
| Uncontrolled Keywords: | |
| Institution: | French research institutions > Centre National de la Recherche Scientifique - CNRS Université de Toulouse > Institut National Polytechnique de Toulouse - INPT Université de Toulouse > Institut National des Sciences Appliquées de Toulouse - INSA Université de Toulouse > Institut Supérieur de l'Aéronautique et de l'Espace - ISAE Université de Toulouse > Université Paul Sabatier-Toulouse III - UPS Université de Toulouse > Université de Toulouse II-Le Mirail - UTM Université de Toulouse > Université de Toulouse I-Sciences Sociales - UT1 |
| Laboratory name: | |
| Statistics: | download |
| Total amount of citations (from ISI Web of Science): | 0 |
| Deposited By: | Alain Haït |
Repository Staff Only: item control page



