OATAO - Open Archive Toulouse Archive Ouverte Open Access Week

BPRM methodology: linking risk management and lesson learnt system for bidding Process

Botero Lopez, Juan Diego and Béler, Cédrick and Noyes, Daniel BPRM methodology: linking risk management and lesson learnt system for bidding Process. (2014) In: APMS 2014, IFIP Conference, 20 September 2014 - 24 September 2014 (Ajaccio, France).

[img] (Document in English)

PDF (Author's version) - Depositor and staff only - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
462kB

Official URL: http://dx.doi.org/10.1007/978-3-662-44739-0_29

Abstract

The working relationship between industrial partners often begins with a bidding procedure by which a costumer chooses a provider of works or services. From the bidder point of view, there are several risks when responding because he must propose an offer for a future development. In this context, con-sidering the whole project cycle is essential to identify all potential risks and take them into account during the development of the technical and commercial offer. In this paper, a methodology for bidding process risk management (BPRM) is presented. It is based on the experience acquired during past projects in order to manage the risks of current BP and make it more efficient.

Item Type:Conference or Workshop Item (Paper)
Additional Information:Thanks to springer editor. The definitive version is available at http://link.springer.com/chapter/10.1007%2F978-3-662-44739-0_29
Audience (conference):International conference proceedings
Uncontrolled Keywords:
Institution:Université de Toulouse > Institut National Polytechnique de Toulouse - INPT (FRANCE)
Laboratory name:
Statistics:download
Deposited By: Juan Diego Botero Lopez
Deposited On:12 Jan 2015 10:13

Repository Staff Only: item control page